This large two storey, 5-bedroom home was built entirely with Fast Fix products, allowing the installation team to start on site soon after the slab was cured, and were able to get the two storey structure to lock up within 1 month without waiting for any other trades.
Due to the high thermal properties of the Fast Fix PIR rigid insulation core, and the connection methods that eliminate any thermal bridging, the project was able to achieve the required energy efficiency rating without any additional sarking or ceiling insulation, or other design compromises.